Stabilised Pavements of Australia - The Experts in Road Recycling

Utah Rd Stage IV Rehabilitation

Sector:

Location:

Port Hedland Western Australia

Client:

Pilbara Port Authority

Duration:

11 weeks

Contract Value:

$ 1.1m

Scope

  • Utah Road, located in the Pilbara region of Western Australia, is a key access route to the Utah Point Bulk Handling Facility within the Port of Port Hedland. It connects the Great Northern Highway to the Utah Point facility, which is a multi-user port used for exporting iron ore and other minerals. Utah Road also provides access to other port facilities like BHP’s Finucane Island and Roy Hill.
  • The existing pavement built in 2009 was now carrying a significantly higher traffic loading than originally designed resulting in rapid deterioration and pavement failures,
  • This project was the final stage in the rehabilitation of the 24/7 live access road where Stabilised Pavements of Australia were engaged to provide a Foam Bitumen treatment of the existing pavement ensuring:
    • A construction time significantly quicker than a traditional overlay
    • A more cost effective option utilising the existing formations resources
      Ability to run traffic on the constructed pavement at the end of each shift
  • This method and treatment achieved the required design performance and enabled for the road operation and performance to continue with no disruption to the flow of product into the facility.